A successful tender resulted in Saunders installing a dedicated direct fired hot water system to the second and third floors of the Grand Parade site in Brighton. Old galvanised pipe work was replaced with a modern ‘Uponor’ multi layer pipe system, providing a speedy and corrosion resistant installation that was carried out eliminating the need for a hot work permit.