Brighton University award Saunders the contract to install new Air Handling equipment at the Huxley Building.
Periodic electrical inspection and testing gets underway at Bedales School for the third consecutive year.
Work gets underway at The Body Shop International HQ for additional security facilities.
November 2011
New MHS boiler plant in installed for the Hilton Hotel at Avisford to replace aging equipment.
The installation of new Powrmatic oil fired heaters is completed at Frensham Garden Centre alongside a new oil tank and pressurised pipe network.
Work continues at TEVA UK at Eastbourne with alterations to heating, ductwork and cooling coils.
October 2011
Saunders Mechanical and Electrical Engineers bring another sucessful horse race season at Goodwood to a close for the year.
Additional electrical distribution upgrades are carried out for Farnborough College following on from work earlier in the year.
September 2011
Saunders engineers take a 'step back in time' at the Goodwood Revival Meeting. A full refurbishment of the lighting in the Earls Court Motor Show is completed with Art Deco light fitting made by Model tec Studios.
New high performance MHS boilers are installed for Summerlea School in West Sussex.
New gas service and gas safety proving is installed for Butlins at Bognor Regis and wins major refurbishment works.
August 2011
Saunders commence work to install new LPG hot water and heating boilers manufactured by Potterton at Goodwood Park Hotel to replace failing oil fired plant.
Saunders commence the installation of a new commercial gas network at Shoreham Academy.
AM Southern place an order to install replacement boiler plant for RBS in Hampshire.
July 2011
Major commercial gas work gets underway at Hillbrow for Brighton University.
For the 18th consecutive year Saunders Engineers carry out the installation of the temporary power generation and supplies for the Goodwood Festival of Speed.
Replacement boilers plant is installed for the Lydhurst Estate.
June 2011
Sussex University place an order for 57 Vaillant condense boilers for the East Slope student accomodation area.
Saunders carry out major upgrading to gas services at Littlehampton Academy in West Sussex.
Work gets underway at Goodwood Racecourse for a mojor refurbishment in the Lennox Encloseure.
May 2011
Laverstoke Park Farm in Hampshire place an order with Saunders for annual commercial and domestic boiler and steam plant.
Slindon College award Saunders the annual servicing contract for their commercial heating plant.
The Hilton Hotel group place an order for replacement air conditioning equipment for the Avisford Hotel.
April 2011
Saunders install replacement welded heating pipework at Lewes Prison in East Sussex.
Annual Peridic electrical inspection and testing is carried out for The Cowdray Trust in Midhurst.
Replacement energy efficient lighting is installed for The Body Shop International at their headquarters in West Sussex.
March 2011
New MHS boiler plant is installed by Saunders for the Hilton Hotel group in West Sussesx.
Replacement Potterton heating equipment is installed at the Bradbury Hotel near Worthing.
Replacement electrical distribution and heating control panels are installed at the Congress Theatre, Eastbourne.
February 2011
Saunders carry out annual servicing for the Chestnut Tree House near Arundel.
Saunders undertake annual M & E work for Farnham Castle.
Urgent repair work is carried out on failed air handling equipemnt for Eastbourne Theatres.
January 2011
Replacement oil tank installed at Royal Nuffield Hospital in Hampshire.
New Potterton Paramount boilers are installed by Saunders at Fishbourne Roman Palace.
Annual servicing gets underway at Butlins in West Sussex.
December 2010
Work gets underway with a major low-energy lighting refurbishment for GAESearle at Fareham with fittings manufactured by Wirefield, supplied by WF Electrical Wholesalers Portsmouth Branch.
Nuffield Hospital place an order for replacement oil tanks at Chandlers Ford, Hampshire.
Bedales School place an order for periodic electrical inspection and testing for their student accommodation areas.
November 2010
Periodic electrical inspection and testing is completed at JCC Lighting head office in West Sussex.
Annual portable appliance testing is completed for the Cowdray Heritage Trust at Midhurst.
Country Homes & Gardens place orders for replacement Powrmatic heaters and annual servicing for all of their garden centres in the south of England.
Saunders carry out servicing to many air conditioning units for the NHS in chichester, West Sussex.
October 2010
Replacemnt warm air heating in installed at Portsmouth Historic Dockyard.
Saunders engineers get to 'play a-round' with Broag boilers at the prestigious Kennels Golf Club at Goodwood.
Repair work is carried out on Keston boiler plant for Farnham Castle in Hampshire.
September 2010
Annual servicing is underway for Notre Dame School at Byfleet for their oil and gas boiler and hot water equipment.
Saunders complete the installation of replacement MEM distribution boards for Farnborough College.
Cosham Community Centre place an order to carry out repiar work to their gas fired heating installation
August 2010
Sussex University award Saunders the contract to replace electrical distribution boards in their accomodation areas.
Annual servicing gets underway for oil and gas fired boiler plant at Borde Hill Gardens.
Saunders install hot water equipment for Nyetimber Winery at their new Crawley facility.
Emergency gas repairs carried out for Sainsbury's at their Basingstoke distribution warehouse.
July 2010
LSG Skychef order replacement Hamworthy hot water boilers for their Crawley facility.
Replacement swimming pool boiler plant is installed for Lakeside Holiday Park at Chichester.
June 2010
Eastbourne Borough Council award Saunders the service contract for the Congress Devonshire and Winter Garden Theatres.
Work gets underway for additional gas safety equipemnt at Crawley for Alpha Flight Services.
Emergency lighting is updated in the Oliver theatre for Bedales School near Petersfield.
May 2010
New gas safety interlock equipment is installed for Alpha Flight services at Heathrow Airport.
Additional air handling ductwork is installed for TEVA UK at their Eastbourne facility.
April 2010
Saunders Specialised Services have been awarded the electrical contract by Goodwood for their Vintage at Goodwood event this year.
Farnborough College have awarded Saunders Specialised Services a major contract to replace dated electrical distribution with the new range of MEM 3 distribution equipment.
Saunders are presented with an electrical and mechanical contract for The Quays.
Alternated Archive lighting has been installed by Saunders at The Body Shop International premises in West Sussex.
March 2010
Installation of new gas safety interlock equipment gets underway for Alpha Flight at Heathrow Airport.
Pre season servicing is carried out for Bourne Leisure at Butlins World Bognor Regis.
Saunders carry out commissions to air handling equipment for building suppliers Wicks at Christchurch.
February 2010
SSD Drives place an order for energy efficient replacement Potterton heater and boiler plant.
Sussex University place orders for Derwent Boilers and air handling equipment.
Country Gardens place an order for four Ambiradwarm air heaters at their Hereford Site.
January 2010
Alpha Flight group award Saunders the service contract for Luton and Stanstead Airports.
Saunders complete the installation of replacement low energy lighting funded by a Carbon Trust Loan.
December 2009
Alpha Flight award Saunders the contract to replace the gas network at their Crawley facility.
Farnham Castle appoint Saunders to intall replacement heating controls in their presigeous apartments.
November 2009
WE HAVE MOVED! We are pleased to announce that due to the expantion of our company we have now relocated to -
Unit 7 Minster Court Courtwick Lane Littlehampton BN17 7RN
Congratulations go to MR.B.Chambers from West Sussex who is the lucky winner of our latest iPod competition.
Replacement underground pipe by UPINOR is installed for The Hilton Hotel group.
Work begins at Butlins bourne leisure to install a replacement 1500kw Powrmatic warm air heater.
Energy saving optimising control equipment is installed at Bradford House, Epsom for AM Southern.
JCC lighting upgrade their office boiler plant with a energy saving condense boiler.
October 2009
Replacement boiler plant is installed at Hilton Hotel Avisford, manufactured by Ideal.
Ten Fujitsu heat pumps are installed for Clockaudio in Hampshire.
Annual servicing is carried out on Ambirad heaters leading architectural glazing company Cantifix.
Replacement extraction plant is installed for Eastbourne theatres.
Daikin air conditioning is installed for CIRRUS LASER.
September 2009
Rossetts Commercial Mercedes Dealership renew their annual service contract for their heating equipment.
Annual service work gets underway for Butlins Bourne Leisure at South Coast World.
Saunders complete the installation of 8 replacement commercial boilers and controls at Varley Hall for Brighton University.
August 2009
Annual servicing is carried out for Bedales School, Dorset House and Highfield School.
The Comfort Hotel at Arundel awards Saunders a new servicing and maintenance contract for their heating equipment.
Broughtons of Surrey, the Bentley Dealership renew their annual service contracts for their boilers, heating and Daikin air conditioning equipment.
July 2009
Saunders complete another successful event at the Goodwood Festival Of Speed, installing over 50 generators and distribution for the event, including support for race teams McLaren, Prodrive, Audi and Ginetta, amongst many others.
Prebendal School, Chichester award Saunders a bi-annual service contract for gas and electricity catering servicing.
Chatsworth Hotel, Worthing place an order with Saunders to install 800 kW of replacement MHS boiler plant and 7 recovery MHS calorifiers. The new equipment will support the Chatsworth Hotel exceptional forward approach for a greener enviroment.
June 2009
Daikin air conditioning is installed for Brighton University, East Sussex.
Replacement oil fired Ideal boilers and high recovery calorifiers are installed at Goodwood Park Hotel, West Sussex.
Annual servicing is carried out for Royal Grammar Schools at Guildford, Surrey.
May 2009
Replacement boiler plant is installed for the Hilton Hotel at Arundel, West Sussex.
Replacement energy efficient Worcester boiler plant is installed at Ditcham Park School.
Saunders welcomes aboard Alpha Flight Services at Luton Airport. Annual servicing to natural gas and LPG boilers and heating equipment.
April 2009
Saunders registered with the GAS safe scheme.
New heating is installed at Queenwood for the University of Brighton
Once again Saunders sponsor this years Scum Run - a charity rally raising over £50,000 on behalf of the childrens hospice CHASE
Work starts on the installation of replacement gas fired warm air heaters for Portsmouth Naval Trust
March 2009
Replacement Powrmatic warm air heating installed for Taj Tyres at Southampton
Annual gas servicing is carried out at Butlins Bognor Regis in preperation for the forthcoming holiday season
February 2009
Work gets under way for London based Cosmo BuildingServices to install Roberts Gordon gas fired warm air heating to four warehouses in Littlehampton.
Replacement oil fired Powrmatic heating is installed for Witley Engineering in Billingshurst.
Replacement LPG gas pipe work, gas safety devices and extract fan interlock is installed in the State Apartments kitchens for The Goodwood Estate in West Sussex.
New gas fired warm air heating manufactured by Ambirad is installed for Kinetrol at their Farnham facility.
Richard Devo is appointed the new Health & Safety Officer for Saunders Specialised Services. Richard has over 30 years experience working in the Construction Industry, and is warmly welcomed.
Saunders register with the CHAS scheme (Contractors Health & Safety Scheme)
Annual servicing gets under way for the Garrick Club in London and Avis Cars at Heathrow airport.
The winner of our 'win an ipod Touch' competition is V.Ardley of Hampshire.
January 2009
Portsmouth City Council award Saunders the contract to install replacement gas fired radiant heating in Fratton Community Centre.
Goodwood Road Racing Company renew the contract with Saunders to provide all electrical services for the Festivalof Speed and Goodwood Revival events until 2011.
Work to upgrade AC equipment for London based Level Properties gets underway in their office block in Camden Town.
December 2008
Preparations are made for the renewal of hot water generation equipment for Alpha Flight Services.
Preparations are made for the installation of high efficiency Stokvis boilers and hot water generation plant at Farnham Castle.
Saunders Specialised Services are listed on the SAFEcontractor scheme
November 2008
Saunders Specialised Services are pleased to announce they have been awarded the annual service and maintenance contract for Saywell International for 2008/2009.
Major gas servicing and repairs get underway in Portchester for BVT Surface Fleet.
October 2008
Replacement fuel efficient condense boilers are installed at Christ Church Surbiton.
Annual thermographic image inspections are completed for The Body Shop International.
September 2008
Saunders Specialised Services celebrate their 10th consecutive year working at the historic Goodwood Revival Meeting
Work continues at Bedales School with the installation of high efficency boilers and hot water generation equipment.
August 2008
Work starts on the major refurbishment of the M&E services in the orthodontic ward at the Royal Surrey Count Hospital, Guildford.
Saunders Specialised Services install Daikin air conditioning for the new IT server room serving all of the Goodwood Estate.
July 2008
Saunders are on hand once again to install temporary generators and power supplies for the world renowned Goodwood Festival of Speed.
Work continues at Brighton University for the installation of major heating plant equipment.
June 2008
Work gets underway at the Goodwood Motor Circuit for their replication of the art deco designed Earls Court motor fair.
Work continues at Butlins, Bognor Regis, for the annual servicing for their gas fired equipment.